Quarter 1 2025 Newsletter

Catch up with us and see what has been happening in the first quarter of 2025!

April 11, 2025

Co-Located BESS and Renewables – Advantages and Risks

Co-locating battery storage with renewables offers clear economic and operational advantages, but there’s a catch. As more projects share a single grid connection, export conflicts are emerging as a hidden risk, threatening project viability. With the right planning and grid strategy, however, these challenges can be managed, unlocking the full potential of co-located assets.

March 26, 2025

Automating Power Plant & Power Electronic Controller Tuning for Enhanced Grid Stability

Blake Clough Consulting is delighted to share key insights from a recent paper by Graduate Consultant James Thornton. This paper was presented at the 23rd Wind & Solar Integration Workshop in Helsinki (October 8–11, 2024) and has now been published in the IET Digital Library.

March 7, 2025

Blake Clough had an amazing time at their annual team event.

On Thursday, February 20th, 2025, our UK team gathered in Manchester for a major team outing as part of our bi-annual meet-ups. This event brought together colleagues from Slaithwaite, Glasgow, and London, providing a great opportunity to connect, socialise, and strengthen team bonds.

March 4, 2025

The Festive Power Grid and Our Holiday Spirit

As we gather with loved ones and enjoy the festivities, it’s worth noting how vital the electricity grid is to the magic of this season. From powering the lights on Christmas trees to supporting energy-intensive seasonal industries, the festive power grid keeps the holidays running smoothly.

December 24, 2024

Blake Clough Consulting: 2024 Year in Review

As 2024 comes to a close, we at Blake Clough Consulting are proud to reflect on an extraordinary year of milestones and success. From doubling our team size and opening new offices in London and Pakistan to winning the prestigious "Third Party Intermediary of the Year" award at the Energy Awards London, this year has been nothing short of transformative.We’ve continued to innovate in power systems, engage with industry leaders at key conferences, and give back to the community through charitable initiatives. Our focus on team development and collaboration has laid the foundation for an even brighter 2025.Here’s to another year of growth, innovation, and excellence!

December 23, 2024

GB Transmission Grid Model – Supporting the Future of Curtailment Analysis

Blake Clough Consulting has developed a Great Britain (GB) Transmission System Model to support Transmission Curtailment Analysis. This in-house development captures both the current GB transmission network and forward-looking scenarios, offering a robust foundation for analysis. Building on the success of Tranche 1, the model is now being deployed for Tranche 2 projects, delivering deeper insights and driving smarter decision-making in the evolving energy landscape.

December 23, 2024

Blake Clough Consulting joins Wind Energy Ireland to Power the Irish Market

Blake Clough Consulting is thrilled to expand into the Irish market in 2025 as part of our commitment to advancing renewable energy solutions. By joining Wind Energy Ireland (WEI), we aim to actively shape the future of Ireland's wind energy sector. Through participation in WEI's Committees and Working Groups, our team is dedicated to driving innovation and supporting the development of sustainable energy across the region. Together, we’re building a cleaner, greener future for Ireland.

December 18, 2024

Major Implications of CP2030 and TMO4+

NESO has unveiled major updates to the upcoming Connections Reform (TMO4+), aligning with the Clean Power 2030 strategy and introducing new criteria for securing connection dates.In this article, Blake Clough breaks down the key proposed changes, which are still under consultation but likely to take effect in 2025. Stay ahead by exploring the critical updates shaping the future of energy connections.

December 3, 2024

Frequency Response Requirements for BESS plants

With the release of Grid Code Issue 6, Revision 17, significant updates have been made to the under-frequency response requirements for Energy Storage Modules, including Battery Energy Storage Systems (BESS).These changes are designed to enhance the reliability and stability of energy systems by ensuring BESS plants can respond effectively during frequency deviations. For operators and developers of energy storage solutions, understanding these new requirements is critical for compliance and optimising performance within the grid framework.

December 3, 2024